Biomass hydraulic power unit inspection

Our on-site hydraulic engineer was called out to inspect a biomass hydraulic power unit.  The valves and hydraulic pump were removed from the hydraulic power unit and taken back to P & R for inspection in our workshop.  No faults were found during the test procedure on the valves.  The engineer returned to site together with the tested valves, a replacement hydraulic pump and coupling.  The hydraulic power unit was reassembled and checked for leaks and operation.  Once satisfied that everything worked OK, our engineer left the site.

Biomass hydraulic power unit inspection - site visit
Biomass hydraulic power unit